Posts from January 2012

the sad basement: a look back

As we begin to work on our basement (again), we thought it might be fun to rewind back to ’06 and revisit the metamorphosis that has already taken place. 

So here goes. When we bought our home in ’06, it came with a finished basement. Yep. Something like this:

A built-in wardrobe, hunter green carpet remnants, lovely drapes and a rainbow for good measure.

Hey there, how many fuse boxes can you fit in an old home? (Out of necessity, we had the electrical service professionally upgraded and a new panel installed before we moved in.)

Ahh, the Indestructo. We’re guessing this was a 1940’s coal-burning furnace that was later converted to heating oil. Because there was no blower, the hot air rose to the first floor via gravity, which is why the ducts are so huge. At any rate, we never used it. Our house had been vacant for a year before we moved in and we didn’t want to sink any money into a heating system that made us super nervous in the first place. But the furnace wasn’t the only problem – our dryer vented into the basement and the washing machine drained directly into the utility sink. Sigh. 

The furnace exhausted out of a brick service chimney (which originally served a wood-burning stove in the basement and one in the kitchen). During one of the home’s earlier “remodels”, an interior stair was added to connect the basement to the main floor. The landing was framed around the chimney. Classy. This made doing laundry the first couple of years a real pain in the ass.

Our basement is half crawl space, which looked something like this 5+ years ago. The ductwork? Covered with asbestos tape. (Before we moved in, we collected samples of various flooring, wallboard, and duct tape throughout the house and had it professionally tested for asbestos.)

For the first year or so, we didn’t do much in the basement besides clean things up, fix the dryer vent and try to make it a bit homier. (At the time, we just had a desktop computer that we set up in the basement “home office”. Oh the shame.) In early 2008, after we’d saved up some money we had the asbestos professionally abated. It was expensive, but not a job we wanted to tackle due to the amount of ductwork and small spaces we’d have to crawl around in. After the crew was done, we were left with this furnace carcass, which we hauled away to a scrap metal collection place.

With the furnace gone, we no longer needed that pesky chimney (in fact, during the roof replacement in ’07 we tore the chimney down to the attic). The whole thing came down easily. Too easily.

During some earlier exploratory demolition, we had discovered some interesting things about our basement. First, the wall between the basement and crawl – y’know…the one holding back 4′-5′ of dirt, was indeed made of wood! As we shook our heads in disbelief, the only logical explanation was that the basement was originally built so that the dirt just natural sloped down and that it needed no formal retaining. Sometime later (likely when the basement was “finished out”), the additional studs and wallboard were added. 

Second, the back portion of our house was sagging a bit because the beams that span over the crawl space had begun to fail. There were a series of posts and small concrete “footings” that had settled over the years and were no longer holding anything up. Before we starting the big dig fest, Kyle added several temporary supports (sitting on CMU post bases) to prevent further sagging.

Now that we were entering the zone of “substantial structural work”, we considered our options and what would be best for the long-term plan for our house. We considered digging out the crawl space to create one larger basement space, but soon realized that the labor involved to remove the dirt and underpin the entire foundation would not be worth the 300+/- square feet that we would gain. We also considered leaving it a dirt crawl space (but still fixing the structural problems), but decided that in such a small house, the space was too valuable to not use. The compromise? Short basement.

In order to convert the crawl into a useable space, we needed to remove a good deal of dirt. This was the beginning of Kyle’s worst nightmare. Good thing he was only 29 at the time. I think we’re now too old (or maybe just too wise) to do this type of thing again.

So he dug and dug and dug. In addition to removing dirt entirely, he also had to dig giant holes for new concrete footings that would support the new enhanced beams.

And as you know from our drainage project last summer, we totally hit hardpan soil. When the pick ax came out, it was a tough day.

OMG WHAT HAVE WE GOT OURSELVES INTO?

To complicate the process further, the only way to get the dirt out was to shovel it into buckets that got carried up the exterior stairs and dumped into wheelbarrows that got carted into the back of our truck. I don’t remember how many trips we had to make, but it was most likely about 10x more than we originally thought. (And now you know why working with dirt makes us so bitter.)

But after a few months, we were ready for concrete. Kyle had never really worked with reinforced concrete, but that didn’t stop him. We bought some rebar off Craigslist that was leftover from a job site and got busy. Kyle even built his own rebar bending jig. 

Craigslist turned out to be a great source for concrete supplies in general – we found most of what we needed for formwork that way and then we resold it after we were done. Since we were doing this on the weekends, we scheduled the concrete work in three different pours. The first weekend was the footings for the new retaining wall.

We used 2x’s as temporary shoring to prevent any blowouts during the pour. The concrete was pumped in through the hose coming through the window, a technique that actually worked quite well.

With the footings in place, Kyle finished up the formwork for the walls.

And the next weekend the pumper truck was back again. 

With the concrete wall in place, it was time to fix the beams. Kyle used the red bottle jacks and a laser level to raise the existing beam back to where it should be. During this time, I was on the main floor doing damage control. With each crank of the jacks all you could hear was the sound of plaster cracking throughout the back half of the house. And this is exactly why we knew we had to fix the floor framing before we did anything on the main floor.

After the beams and floor joists where level again, Kyle sistered on LVL’s to each side of the original beams and installed new posts on top of the new concrete footings. With plenty of hefty connections and bolts, it was like finishing up reconstructive surgery on our elderly house. Sadly, the digging wasn’t done just yet. Kyle still needed to level out the remaining dirt so we could pour a thin concrete slab over the entire crawl space.

After the dirt was level, we added a vapor barrier, welded wire mesh reinforcing and a new slab on top. We also added a layer or rigid insulation along the perimeter to provide a thermal break between the foundation wall and slab.

This project took us nearly a year from start to finish. In between adding the new beams and the crawl space slab, we also gutted and remodeled our bedroom and bathroom. To further add to the insanity, during this time we were also taking the first 6 (of 9) architecture registration exams. Oh 2008, you were so painful.

The final step in the crawl space was to move stuff back in. To save our knees, Kyle found these used interlocking rubber tiles off Craigslist which work like a charm.

After two years without a heating system, we finally were able to get a new furnace! To free up space in the basement, we chose a model that could fit in the crawl space. The ductwork was also designed so most of it stays in the crawl space (which will come in handy during this next phase of basement work).

In 2009, we completed a seismic retrofit to our basement. In old houses like ours, the wood framing was not properly connected to the concrete foundation walls. This becomes a weak point during an earthquake, something akin to hitting someone in the knees with a bat. So to remedy the situation, Kyle installed hold downs and anchor bolts along the perimeter to tie the framing to the foundation. Then we insulated and added a vapor barrier.

Finally, we added plywood to create a more structural shear wall.

During this time, our “stuff” had been shuffled around from one location to another, but I was finally able to implement my obsessive organizational skills in our new short basement. (We call it a short basement because it is a conditioned space and does not require any type of venting.) We use the short basement mostly for out of season stuff, like decorations, ski gear, camping gear, luggage, etc. It’s also been an invaluable space for various other storage needs as we’ve tackled different rooms of the house.

In the early part of 2010, we started packing up our belongings on the main floor and moving them down to the basement. A few months later, we moved our furniture down and set up our temporary basement apartment. It wasn’t stylish, but it was functional.

For the kitchen we went with industrial chic. This was our kitchen for about 7 months.

When the big remodel of 2010 was done, we moved our furniture back upstairs, but the basement had become a total disaster area, filled with building materials, empty boxes and who knows what else. Over the last year, we’ve been able to reestablish order to the space and purge what we no longer needed. (Which is good, because now we’re ready to tear things up again.)

And that’s how we deconstructed and reconstructed our basement over the course of 5 years. Now it’s time to actually finish something (no more sad basement?). More details coming.

2011 year in review

Well, another year has come and gone and like 2010, we wanted to recap the progress that was made. Compared to 2010, last year was not quite as epic in the remodel department. Even though we didn’t get as much done as we originally planned (c’mon, when does that ever happen?), we’re feeling pretty good about what we did accomplish. 2011 was also all about striking a balance between renovation projects and having a life outside our house. It’s not always an easy goal to reach, but after 5 years in our house it’s an important one. 

January

We spent the first couple months of 2011 finishing up projects from the year before. In January, Kyle took a welding class, bought some equipment, built this and then built this:

Not bad for his first real project, huh? Yes, my husband is some kind of amazing bad ass who is always surprising me with what he can do.

February

In February, we started focusing on the interior sliding doors. Originally the doors were going to be welded steel frames with a painted MDO core, but after mocking up the bathroom door we weren’t happy with how it looked or how much time it took to fabricate. So we opted for paint-grade door slabs instead. For colors, we picked out shades of blue, yellow and teal and ultimately landed on “lakeside cabin” and “thunderbird” for the doors.

March

This month we finished the basement stairs. We used VG fir for the treads and risers and Kyle designed and fabricated the handrail out of tube steel and fir.

April

In April we completed the sliding doors! Our bedroom had not had a door for 2.5 years and our bathroom had been doorless for over a year. Privacy can be a real luxury when remodeling.

Although we decided to stick with only two colors for the doors, we found an easy way to incorporate some mustard yellow at our big kitchen window. (We later went a little yellow-crazy with accessories and furniture!)

May

This month we finally got some art on the walls! This series of wood block photos was taken by our friend Todd and hung in simple IKEA aluminum frames.

We painted and installed carpet in the loft earlier in the year, but we finally turned it into a sleeping nook this month. The bed is an Aerobed that we already owned. The duvet is from West Elm and the night stand is a painted step stool from IKEA. The space certainly came in handy last summer when so many friends and family came to visit.

June

In March, we laid out our plans for the big outdoor project. The first step was to demolish the concrete driveway apron and sidewalk in our backyard to make way for a new deck.

Kyle used a concrete saw to cut up the old sidewalk that wrapped around the back of our house. We transferred the slabs to our front side yard (using this crazy boulder dolly!) and will eventually use them as pavers for the front yard.

The second half of June was all about deck building! The plan was to finish it before summer started (which is often considered to be July 5th around here).

Well, we got close. =)

July

In July, we played outside. With temperatures in the low 80’s it was just too hot for manual labor.

August

In early August, we had a party for Kyle’s 33rd birthday. The deck was technically finished and with killer party lights, no one noticed the mounds of dirt or missing planter boxes. 

It was a great party, but the next morning we were all feeling it.

During the second half of August Kyle fulfilled his dream of renting some heavy machinery for the house. Before we could think about landscaping (or finish out the basement) we needed to add foundation drains to the front half of the house. (Keyword: DIGGING.)

We also added a new member to our family this month! When a friend was trying to find a home for this stray kitten, we just couldn’t say no. So we adopted little Chloe. And then we found she was actually a he and quickly renamed him Felix. It was iffy at first, but Bailey and Felix soon became BFFs.

September

The drainage project dragged into September (and October), thanks to a few setbacks with machinery and hardpan soil. But we trudged through. Begrudgingly. 

We did manage to get away for a long weekend to Eastern Washington to celebrate my 31st birthday. Wine tasting, spa treatments and a little R&R was just what we needed.

With the rainy season looming, we also set aside an afternoon to put the Penofin finish on the new deck. So shiny, so pretty.

October

In October we finally buttoned up the drainage and crossed our fingers that our basement would stay dry all winter (so far, so good!). We ran out of time to install (or even think about) landscaping, so that’s on the agenda again for this year.

Kyle also built this ipe “bridge” to connect the stoop to our existing concrete steps.

During this month we also refinanced our mortgage, which meant prepping for another appraisal. To play it safe, we added an IKEA wardrobe and bed to the flex room to assure the appraiser that our home was now a 2-bedroom, 1-bath.

At the end of the month Kyle squeezed in one more project – a steel planter box for the north side of the deck. We still need to fabricate two additional boxes that will go on the south side, but that’s a project for next year. Which is now this year. AHH!

November

As the gray permacloud rolled in, we turned our attention this month to something more uplifting – furniture!

We scored six vintage Eames fiberglass shells and added reproduction dowel bases that we found right here in Seattle! Shell chairs had been on our wish list for years and we were excited to finally pull the trigger.

The new chairs inspired a bit of furniture rearranging and we soon discovered that our BoConcept coffee table actually works a lot better in the Flex/TV room. To fill the void, we designed this table that can transform from end table to coffee table in about 10 seconds flat.

In a moment of furniture weakness, we also decided to finally ordered that LCW that we’d been pining over since our days in architecture school. (Thank goodness Herman Miller has a generous architect discount!)

At the end of the month we celebrated Bailey’s 6th birthday!

December

December turned out to be a very busy month. First we spent about 4 days down in Phoenix at the Hanley Wood Reinvention conference where we saw lots of modern homes (with so much glazing!), Taliesin West and the Will Bruder library. We also spent a lot of time in the Biltmore Hotel (where the conference was held), listening to various speakers and talking with other residential architects from all over the country.

When we got back from Phoenix, the holiday season was in full swing and we were jumping from one event to the next, while trying to cram in some shopping and baking in between.

For Christmas, we flew back to Oklahoma to spend some time with our families. We had a great time, but I’ve decided that six plane rides in one month is too much! (Also, could someone please hook a girl up with a direct flight from Seattle to Tulsa?)

So that was 2011! And what’s in store for 2012? Lots! (By the way, I love it when relatives and friends ask if we’re happy to be done with the house. Done? Ha! Never…) We’ll do another post about our project list for this year, but let’s just say that the basement o’ shame is first in line.